Schematic contour representation — not pilot field data
On sloped land, water, soil and sunlight are never evenly distributed. senjuland combines drone photogrammetry, six-layer topographic analysis and multi-year satellite monitoring to build a decision-support system that reads the orchard zone by zone.
- Slope above 25% in the pilot field
- %46,8
- Steep slope above 40%
- 2.728 m²
- Modules running today
- 6
- R&D work packages
- 6
Pilot: a working hazelnut orchard in Ereğli. We do not publish any savings claim that has not been measured and verified.